Making Cost-Benefit Analysis a Practical Tool for Evaluation
DOI:
https://doi.org/10.3138/cjpe.021.003Abstract
A cost-benefit evaluation requires precise data on program outcomes. However, such data are unavailable when the analysis is prospective, and expensive and time-consuming to collect when the analysis is retrospective. This problem of uncertain data is partly solved by the revised version of the Treasury Board Benefit-Cost Analysis Guide (Watson & Mallory, 1997), which allows probabilistic estimates of program results to be used in the analysis. There are not yet many examples of this technique in practice. One is Transport Canada’s evaluation of alternative requirements for small commercial vessels to carry emergency signaling equipment. This article describes that evaluation and assesses how well the methodology worked.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2006 Kenneth Watson

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Authors contributing to The Canadian Journal of Program Evaluation agree to release their articles under the Creative Commons Attribution-Noncommercial 4.0 (CC-BY-NC) license. This licence allows this work to be copied, distributed, remixed, transformed, and built upon for any purpose provided that appropriate attribution is given, a link is provided to the license, and changes made were indicated.
Authors retain copyright of their work and grant the journal right of first publication.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.